Sub-Surf Drip/O&M Friendly Design&Install: Wenatchee 10.23.19 NM

Non Member: Sub Surface Drip/O&M Friendly Design and Install of OSS Sub-Surface Drip – This class explores the practical application of sub-surface drip systems and Washington State guidelines, including detailed discussion of design procedures of different types of drip systems with various components, installation techniques and O&M needs based on different technologies and current applications. O&M Friendly Design and Install of OSS •A review of the minimum's for installation of the various technologies and components. •Discussion of common O&M issues per technology, which are problematic or persistent •Consideration for design/installation changes over time and the impact on O&M •Solutions for designers to consider in the design phase, for Installers to consider in the •Installation phase and feedback from the O&M professionals on what they would like to see. •O&M system upgrades or changes that can be accomplished by the O&M professional that would not change the intent of the design to simplify O&M activities.

Location: *UPDATE* Red Lion Hotel - 1225 N Wenatchee Ave, Wenatchee, WA 98801

Class starts at 8:30am Date: October 23, 2019 CEU: 8 Credit Hours

Sub-Surf Drip/O&M Friendly Design&Install: Wenatchee 10.23.19 NM
Click To Enlarge
  • Item #: SSD/O&M,Des&Inst OSS 10.23.19 NM
  * Marked fields are required.
Qty*
Price $195.00
Availability In-Stock